Mason Run "New Urbanism" Neighborhood
WINNER - SOCIAL IMPACT
| Soil and Materials Engineers, Inc. |
1. Did the project increase job opportunities in the community, or communities, surrounding the site?
Although Mason Run will not provide long term employment, it's providing steady construction employment for approximately 60 construction workers for the 10 to 12 years of development. The development brings residents who will attract employers. It's projected to result in creation of an additional 110 long-term jobs in the community.
Before:
|
After:
|
 |
 |
2. Did the project help to decrease local crime rates or to improve human health and safety?
The abandoned 300,000 square-foot plant and ancillary buildings constituted a serious and imminent threat to public safety and welfare. The site was contaminated primarily with hazardous substances (PCB, arsenic, lead, polycyclic aromatic hydrocarbons, and others) and some commingled residual petroleum from historic underground fuel tanks removed by CPC. Children, teenagers, or others often illegally occupied the buildings as a place to play or conduct illegal activities. At the time of acquisition, the legal tools available to the City to force the bankrupt owner to mitigate the threats to public health and safety were very limited and costly, and therefore, practically non-existent; therefore, the City acquired title to the property. Shortly after purchasing the site for a nominal amount, the City demolished the above-grade structures to mitigate that threat to health and safety. The response actions to prepare the site for development mitigated potential surface and hidden subsurface environmental impacts that threatened human health and the environment. Environmental response actions also removed the negative aesthetic impacts from the many acres of cinder/ash fill that inhibited vegetative growth and produced black dust on windy days.
3. What was most challenging about your project?
The sheer scale of preparing the property for residential redevelopment presented the greatest challenge to the project team. The cost of site preparation was the greatest obstacle to Mason Run’s existence. Remediating over 140,000 cubic yards of contaminated cinder/ash fill covering approximately 42 acres of the site, localized areas of chemically impacted soil, and impacted fill and residual industrial contamination in and around the basements and other structures did not pose a significant technical challenge; neither did the presence of over 110,000 cubic yards of fill and concrete in the 350,000 square feet of buried basements, pits, footings, foundations, and other structures that had to be removed before homes could be constructed. The primary challenge was logistics, and the primary obstacle was money. A secondary challenge was to design the most sustainable approaches possible for addressing the site preparation challenges.
The initial cost estimate for preparing the site was approximately $9 million to $10 million. Removal of over 140,000 cubic yards of coal ash was deemed necessary to facilitate residential redevelopment of the site. One of the challenges to managing the cinder/ash fill was a requirement to maintain the existing site grade for utility placement. This meant that the two feet of cinder/ash fill would have to be replaced with clean fill after removal and verification that remediation achieved unlimited residential use criteria. The traditional approach of removing and disposing the cinder/ash fill in a landfill and replacing it with clean fill was too costly to make the project economically viable. Furthermore, it was not considered a sustainable solution, since it would use landfill space and require importation of off-site resources, namely 140,000 cubic yards of clean soil.
The project team designed and negotiated with the MDEQ the technical and regulatory specifications for an alternate, sustainable, "on-site" solution whereby clean soil was excavated from beneath the road ROWs and parks, and the cinder/ash fill then was removed from the residential lots and encapsulated as inert fill beneath pavement or clean fill in these areas. The native soil removed from the ROWs and parks then was used to replace the impacted coal ash fill removed from residential lots. As mentioned previously, this approach saved over $2.5 million in response costs and made the project economically viable.
The ultimate site cleanup costs were determined to be approximately $7.4 million. This represented costs that had to be incurred before land could be transferred to the developer and homes could be built. The project team developed a creative financing program based on Michigan's Brownfield Redevelopment Financing Act (Public Act 381 of 1996, as amended), which provides for tax increment financing (TIF) of brownfield redevelopment costs. The team designed a six-phase approach for redeveloping the site, which addressed issues of product absorption, generation of sufficient incremental taxes to securely finance completed cleanup activities, and provide sufficient time to secure brownfield financing (loans) to bridge the gap between incurring the cleanup costs and realizing the tax increment revenues from completed homes. The project team secured a $1 million state grant and $6.4 million in federal, state and local loans. The project financing program is described in more detail below.

|
Send Your Feedback |
 |
Click here to expand the feedback form to collapse the feedback form
|
|
|
|
| |
Industry Profiles
|
|
Rick Booth National Leader for Finance, Insurance, Real Estate, and Legal Market Sector, Golder Associates Inc. St. Louis, Mo. |
|
Aaron Scheff Brownfield Response Program Manager, Idaho Dept. of Environmental Quality Idaho |
|
Timothy Murray Lieutenant Governor, state of Massachusetts Boston, Mass. |
|
Count On It
 28 percent approximate amount of all energy used in the Unites States for transporting people and goods from one place to another.
Source U.S. Department of Energy
 200-300 estimated number of hydrogen-fueled vehicles in the United States today
Source U.S. Department of Energy
 9,783,000 number of barrels of crude oil the United States imports each day.
Source U.S. Department of Energy
 1 million number of gallons of fresh water that can be contaminated from the used oil from one oil change.
Source U.S. Environmental Protection Agency
 20 million number of people that celebrated the first Earth Day on Aril 22, 1970.
Source U.S. Environmental Protection Agency
 $2.3 billion amount President Obama awarded for clean energy manufacturing projects across the United States
Source U.S. Department of Energy
 509 approximate number of operational landfill gas (LFG) energy projects currently in the United States. LFG electricity generation projects provide the energy equivalent of powering more than 920,000 homes annually
Source U.S. Environmental Protection Agency
|
|
|